Author/Authors :
Razzaghzadeh, R Mining Engineering Department - Engineering Faculty - Imam Khomeini International University - Qazvin, Iran , Shakoor Shahabi, R Mining Engineering Department - Engineering Faculty - Imam Khomeini International University - Qazvin, Iran , Nouri Qarahasanluo, A Faculty of Mining - Petroleum & Geophysics Engineering - Shahrood University of Technology - Shahrood, Iran
Abstract :
The appropriate operating of mining machines is affected by both the executive and
environmental factors. Considering the effects and the related risks lead to a better
understanding of the failures of such machines. This leads to a proper prediction of the
reliability parameters of such machines. In this research work, the reliability and
maintainability analysis of the loading and haulage machines in the Sungun Copper
Mine, considering the repair condition as multiple repairable units, was performed. For
this purpose, the data necessary for the loading and haulage equipment including 2
loaders and 8 dump trucks for a 15-month period was collected and categorized in 10
operational units after the system and sub-systems of the department were determined.
Initially, the time between failures (TBFs) and time to repair (TTR) for each unit was
calculated. Then 20 sub-systems were developed. Primarily, the Stata software was
utilized to carry out the heterogeneity test for all the sub-systems. In consequence, most
of the sub-systems were regarded as the heterogeneous ones, except for 7 of them
including the dump truck units 1, 2, 3, 4, 5, 7, and 8 in TBFs. Hence, "PHM" that is a
covariate-based model displayed the heterogeneous group. Its reliability function was
also estimated. For the next step, the trend tests were done on the non-heterogeneous
sub-systems by means of the Minitab software. The homogeneous sub-systems with
failure trend were modeled by “NHPP”. Afterwards, the non-trended sub-systems
formed the data group. Later, the correlation tests were modeled by “HPP”. Finally, the
reliability and maintainability functions were calculated with the 95% confidence level.
Keywords :
Sungun Copper Mine , Reliability , Maintainability , Multiple Repairable Units