Title of article
Bi-Criteria Robotic Cell Scheduling and Operation Allocation in the Presence of Break-downs
Author/Authors
vaisi, bahreh School of Industrial Engineering South Tehran Branch - Islamic Azad University, Tehran, Iran , Farughi, hiwa School of Industrial Engineering South Tehran Branch - Islamic Azad University, Tehran, Iran , raissi, sadigh School of Industrial Engineering South Tehran Branch - Islamic Azad University, Tehran, Iran
Pages
16
From page
343
To page
358
Abstract
This paper focused on scheduling problems arising in a two-machine,
identical parts robotic cell, which was configured in a flow shop.
Through the current research, a mathematical programming model
on minimizing cycle time as well as operational cost, considering the
availability of a robotic cell as a constraint, was proposed to search
for the optimum allocation and schedule of operations for both two
machines. Two solution procedures, including weighted sum method
and ε-constraint method, were provided. Based on the weighted sum
method, like some previous studies, sensitivity analysis on model
parameters was done, and the optimum solutions were compared
with previous results, while ε-constraint method could find the
Pareto optimal solutions to problems with up to 18 operations in a
reasonable time.
Keywords
Robotic manufacturing cell , Scheduling , Breakdowns , Weighted sum method , ε-constraint method
Journal title
Astroparticle Physics
Serial Year
2018
Record number
2474976
Link To Document