Title of article :
Assessment of Change Orders Attributes in Preconstruction and Construction Phase
Author/Authors :
Khoso ، Ali Raza Civil Engineering Department - Mehran University of Engineering and Technology , Khan ، Jam Department of Civil Engineering - Quaid-e-Awam University College Larkana (QUCEST) , Faiz ، Rizwan School of Civil Engineering, Faculty of Engineering - Universiti Teknologi Malaysia , Akhund ، Muhammad Civil Engineering Department - ISRA University
From page :
616
To page :
623
Abstract :
Construction projects are very complex in nature. Each activity involves multiple varying tasks. Construction industry is the main source of economic growth. When change order occur performance of projects momentously affected.  Change orders often have a serious impact on the quality, time and cost. Eventually it results in disputes, delays, and dissatisfactions among stakeholders and ultimately results in failures of projects. In past several studies have been done to evaluate the causes of change order and its effects. Attempts have been made to quantify these impacts by many researchers, but the aim of this study is to identify the causes of change order in two different phases i.e. preconstruction and construction stage. Views were taken from relevant experts over included factors after indepth literature review from past researches. A questionnaire was made and floated with different construction players from clients, consultants and contractors side. The data was analyzed by SPSS using average index technique. The analysis of data showed that, Mistakes in specifications, Mistakes in design and Lack of experience in selecting construction team by client are the most critical factors during preconstruction phase. Whereas, Design modification by owner, change in scope at later stage and Delays in payment by client are most critical factors of construction phase, responsible for change order. The extensive discussion of these factors revealed various parameters related to Pakistan construction. This study will enable the clients, consultants and contractors to be aware of factors which causes changes in orders and their consequences on project completion. By the identification of possible reasons, the right decisions can be made to mark the project successful.
Keywords :
Change Orders , Client , Preconstruction , Construction , Pakistan
Journal title :
Civil Engineering Journal
Record number :
2502858
Link To Document :
بازگشت