Title of article :
Identification of hazardous and risk assessment of energy sources for Kavir Steel Complex using ETBA method in 2015
Author/Authors :
Hesami Arani ، Mohsen Environmental Health Engineering - Kavir Steel Complex , Ghaneian ، Mohammad Taghi Department of Environmental Health Engineering - School of Public Health - Shahid Sadoughi University of Medical Sciences , Halvani ، Gholam Hossain Department of Occupational Health Engineering - School of Public Health - Shahid Sadoughi University of Medical Sciences , Dakhilpour ، Mahmoud Occupational Health Engineering - Kavir Steel Complex , Delavar ، Javad Safety Engineering - Kavir Steel Complex , Rezapour ، Habib Allah Occupational Health Engineering - School of Public Health - Mazandran University of Medical Sciences , Dehghani Arani ، Monireh Department of biostatistics - School of Public Health - Shahid Beheshti University of Medical Sciences , Tazik ، Moslem Department of Environmental Health Engineering - School of Public Health - Tehran University of Medical Sciences
From page :
18
To page :
27
Abstract :
Introduction: The steel industry is known as the most important consumer of energy and fuel. In doing so, ensuring safety of energy sources of a country needs to expect the risks analysis in order to select a comprehensive approach. This study aimed to identify the energy consumption and control measures available in the Hot Rolling Kavir Steel Complex and to conduct risk assessment by Energy Tracking and Barrier Analysis method (ETBA). Materials and methods: In this study, initially a team of experts identified mobilized energies and risks of the system and control measures using ETBA sheet that result of a standard MILSTD-882B. Then, the initial risk assessment was carried out using ETBA method. Finally, the control strategies were proposed and the secondary risk level was calculated. Results: Using ETBA, in total 19 energy types and 74 risk types were successfully identified so that in the first stage, 19 risks were unacceptable, 50 risks were unfavorable and 5 risks were acceptable for which the corrective strategies were required Then, the corrective revisions were proposed to reduce the risk level and calculate RAC2. Conclusion: Corrective controlling measures including safety, health and environmental training, continual monitoring and ongoing visit are effective using the safety equipment and personal protective equipment for reducing the unacceptable risks.
Keywords :
Kavir Steel Complex , Energy Trace and Barrier Analysis (ETBA) , Risk assessment , Energy
Journal title :
Journal of Basic Research in Medical Sciences
Journal title :
Journal of Basic Research in Medical Sciences
Record number :
2507809
Link To Document :
بازگشت