Title of article :
On Single Machine Scheduling Problem with Distinct due Dates under Fuzzy Environment
Author/Authors :
Khalifa ، H. A. Mathematics Department - College of Science and Arts - Qassim University
Abstract :
This research article proposes a single machine scheduling problem subject to distinct due dates in fuzzy environment. The proposed problem is considered in fuzzy environment with an attempt to sequence of the 𝑛−jobs. The total penalty cost is considered as the composition of all the total earliness and tardiness cost. The aim of this research work is to minimize the total penalty cost. A method to minimize the total penalty cost due to earliness or lateness of job in fuzzy environment is proposed. A numerical example is illustrated to support the proposed method in this study.
Keywords :
Single machine , Distinct due dates , Early , lately machine problem , (𝛼,𝛽)− interval , valued fuzzy number , Signed distance ranking
Journal title :
International Journal of Supply and Operations Management (IJSOM)