Title of article
Optimal production policy for a closed-loop supply chain with stochastic lead time and learning in production
Author/Authors
Giri, B.C. Department of Mathematics - Jadavpur University, Kolkata, India , Masanta, M. Department of Mathematics - Jadavpur University, Kolkata, India
Pages
16
From page
2936
To page
2951
Abstract
This paper considers a closed-loop supply chain with one manufacturer and one
retailer for trading a single product. On behalf of the manufacturer, the retailer collects the
used items from the end customers for possible remanufacturing. The production of nished
products (manufactured and remanufactured) is subject to learning. The lead time for the
retailer is assumed to be stochastic. The manufacturer delivers the retailer's order quantity
in a number of equal-sized shipments. The objective is to determine the optimal number of
shipments and shipment size by minimizing the average expected total cost of the closedloop supply chain. A solution method for the model is presented, and important results
are obtained for numerical examples. According to the numerical study, an impressive cost
reduction due to consideration of learning in production and remanufacturing is observed.
To investigate the impact of key model parameters on the optimal results, a sensitivity
analysis is also carried out. The proposed model is applicable to those business rms
whose production process is executed by the human beings.
Keywords
Closed-loop supply chain , Stochastic lead time , Learning , Remanufacturing
Journal title
Scientia Iranica(Transactions E: Industrial Engineering)
Serial Year
2019
Record number
2525065
Link To Document