Title of article :
Project scheduling optimization for contractor’s net present value maximization using meta-heuristic algorithms: A case study
Author/Authors :
Zareei ، Mostafa Department of Industrial Engineering - Eyvanakey University , Kamranrad ، Reza Imam Hossein University of Technology , Zareei ، Mojtaba Department of Industrial Engineering - Faculty of Engineering - Semnan University , Emami ، Iman Islamic Azad University, South Tehran Branch
From page :
36
To page :
55
Abstract :
Today’s competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and the total cost is balanced. Given the balance between time and cost, and to achieve these goals, there are several options that should be considered among existing options and ultimately the best option to perform activities to complete the project. In this research, a mathematical model of project scheduling with multiple goals based on cost patterns and consideration of resource constraints is presented, and this problem is considered as a problem for NPhard issues in family hybrid optimization. GA، PSO and SA Metaheuristic algorithms are used to solve the proposed model in project scheduling and the results are compared with each other.
Keywords :
Project scheduling , NPV maximizing , payment patterns , Resource constraints , metaheuristic algorithms
Journal title :
Journal of Industrial Engineering and Management Studies
Journal title :
Journal of Industrial Engineering and Management Studies
Record number :
2526523
Link To Document :
بازگشت