Title of article :
Optimizing strategy software for repetitive construction projects within multi-mode resources
Author/Authors :
Aziz, Remon Fayek Alexandria University - Faculty of Engineering - Structural Engineering Department, Egypt
From page :
373
To page :
385
Abstract :
Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS) for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS) will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1) Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2) Visualizing and viewing the generated optimal trade-off; and (3) Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1) A user interface module; (2) A database module; (3) A running module; (4) A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS) to an optimization expressway of repetitive construction project.
Keywords :
Construction repetitive projects Multi , mode resources Multi , objective optimization and software
Journal title :
Alexandria Engineering Journal
Journal title :
Alexandria Engineering Journal
Record number :
2540248