Title of article
How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot
Author/Authors
Sadeghian, Ramin bu ali sina university of hamadan - Engineering Department, همدان, ايران
From page
17
To page
22
Abstract
he Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requirements Planning (CMRP) approach. We discuss the disadvantages of Discrete MRP (DMRP) approach and analyze the conditions, applications and the manner of applying CMRP approach in our problems.
Keywords
Discrete Materials Requirements Planning (DMRP) , Continuous Materials Requirements Planning (CMRP) , Order Type (OT) , Lot for Lot (L4L)
Journal title
International Journal of Industrial Engineering and Production Research
Journal title
International Journal of Industrial Engineering and Production Research
Record number
2564999
Link To Document