Title of article :
Analysis of lumpiness phenomenon in MRP
Author/Authors :
Aryanezhad, Mir B. iran university of science and technology - Dep of Industrial Engineering, تهران, ايران , Makui, Ahmad iran university of science and technology - Dep of Industrial Engineering, تهران, ايران , Masoumi, Shiba islamic azad university - Dep of Industrial Engineering, ايران
From page :
83
To page :
89
Abstract :
Occurrence of chaotic behaviors because of fluctuations creation and their intensified transfer along thechain is one of the main causes of inefficiency of Material Requirements Planning (MRP) based supply chains.One of the reasons of the inefficiency is the lumpiness phenomenon. Through this phenomenon, some partshave an irregular production schedule, with nothing produced in some periods and large batches released inother periods. In this paper it is tried via the mathematical models to analyze this phenomenon. Using the mathematicaldeduction it is shown that the inventory fluctuations in upper levels of Bill of Material (BOM) increation of lumpiness phenomenon are more effective than the inferior levels.
Keywords :
MRP , Lumpiness , Variance , Mathematical model
Journal title :
Journal of Industrial Engineering International
Journal title :
Journal of Industrial Engineering International
Record number :
2584859
Link To Document :
بازگشت