Title of article :
Predicting morphological changes DS New Naga-Hammadi Barrage for extreme Nile flood flows: A Monte Carlo analysis
Author/Authors :
Sattar, Ahmed M.A. Cairo University - Faculty of Engineering - Irrigation and Hydraulics Department, Egypt , Raslan, Yasser M. National Water Research Center - Nile Research Institute, Egypt
Abstract :
While construction of the Aswan High Dam (AHD) has stopped concurrent flooding events, River Nile is still subject to low intensity flood waves resulting from controlled release of water from the dam reservoir. Analysis of flow released from New Naga-Hammadi Barrage, which is located at 3460 km downstream AHD indicated an increase in magnitude of flood released from the barrage in the past 10 years. A 2D numerical mobile bed model is utilized to investigate the possible morphological changes in the downstream of Naga-Hammadi Barrage from possible higher flood releases. Monte Carlo simulation analyses (MCS) is applied to the deterministic results of the 2D model to account for and assess the uncertainty of sediment parameters and formulations in addition to sacristy of field measurements. Results showed that the predicted volume of erosion yielded the highest uncertainty and variation from deterministic run, while navigation velocity yielded the least uncertainty. Furthermore, the error budget method is used to rank various sediment parameters for their contribution in the total prediction uncertainty. It is found that the suspended sediment contributed to output uncertainty more than other sediment parameters followed by bed load with 10% less order of magnitude.
Keywords :
River Nile , Bed load , Suspended load , Monte Carlo simulation , 2D numerical model , New Naga , Hammadi Barrage
Journal title :
Journal of Advanced Research
Journal title :
Journal of Advanced Research