Title of article :
Techno-economic Assessment of Coal to SNG Power Plant in Kalimantan
Author/Authors :
Andika, Riezqa School of Chemical Engineering - Yeungnam University - Gyeongsan , Republic of Korea , Valentina, Department of Chemical - Material - and Chemical Engineering - Politecnico di Milano, Italy
Pages :
14
From page :
156
To page :
169
Abstract :
As the most abundant and widely distributed fossil fuel, coal has become a key component of energy sources in worldwide. However, air pollutants from coal power plants contribute carbon dioxide emissions. Therefore, understanding how to taking care coal in industrial point of view is important. This paper focused on the feasibility study, including process design and simulation, of a coal to SNG power plant in Kalimantan in order to fulfill its electricity demand. In 2019, it is estimated that Kalimantan will need 2446 MW of electricity and it reaches 2518 MW in 2024. This study allows a thorough evaluation both in technology and commercial point of view. The data for the model is gathered through literature survey from government institution reports and academic papers. Aspen HYSYS is used for modelling the power plant consists of two blocks which are SNG production block and power block. The economic evaluation is vary depends on the pay-back period, capital and operational cost which are coal price, and electricity cost. The results of this study can be used as support tool for energy development plan as well as policy-making in Indonesia.
Keywords :
SNG , Kalimantan Simulation , Energy crisis , Clean energy , Coal
Journal title :
Indonesian Journal of Science and Technology
Serial Year :
2016
Full Text URL :
Record number :
2604270
Link To Document :
بازگشت