Title of article :
Early Phase Process Evaluation: Industrial Practices
Author/Authors :
Putra, Zulfan Adi TMC Chemical - Flight Forum 107 - NL-5657 DC Eindhoven, The Netherlands
Pages :
11
From page :
238
To page :
248
Abstract :
Process route evaluation is a part of research and development (R&D) works in an industrial chemical project life cycle. In this early phase, good process evaluation, including process synthesis and designs, provide guidance’s on the R&D project. The paper aimed to collect practical methods used in this early phase process route evaluation from author’s 10 years of industrial experiences. The collected methods range from forward-backward process synthesis, functional process design, use of cost estimation, and applications of Monte Carlo simulation. Led by a good project management (e.g. via a stage-gate approach) use of these methods have shown beneficial results. Some important results are strong arguments on whether or not the project will continue, as well as relevant technical and economic issues identified during this early phase process synthesis and design. Later on, these issues become guidance’s to the follow-up project, if it is continued.
Keywords :
Monte Carlo simulation , Functional process design , Cost estimation , Forward-backward process synthesis , Stage-gate approach
Journal title :
Indonesian Journal of Science and Technology
Serial Year :
2016
Full Text URL :
Record number :
2604286
Link To Document :
بازگشت