Title of article
A Simulation Optimization Approach for The Multi-Objective Multi- Mode Resource Constraint Project Scheduling Problem
Author/Authors
Azimi, Parham Department of Industrial and Mechanical Engineering - Qazvin Islamic Azad University, Qazvin, Iran , Sholekar, Shahed Qazvin Islamic Azad University, Qazvin, Iran
Pages
9
From page
37
To page
45
Abstract
According to the real projects’ data, activity durations are affected by numerous parameters. In this
research, we have developed a multi-resource multi objective multi-mode resource constrained
scheduling problem with stochastic durations where the mean and the standard deviation of activity
durations are related to the mode in which each activity is performed. The objective functions of model
were to minimize the net present value and makespan of the project. A simulation-based optimization
approach was used to handle the problem with several stochastic events. This feature helped us to find
several solutions quickly while there was no need to take simplification assumptions. To test the
efficiency of the proposed algorithm, several test problems were taken from the PSPLIB directory and
solved. The results show the efficiency of the proposed algorithm both in quality of the solutions and
the speed.
Keywords
Simulation-based optimization , Resource constraints project scheduling , Multi-objective , Multi-modes
Journal title
International Journal of Industrial Engineering and Production Research
Serial Year
2021
Record number
2631720
Link To Document