Title of article :
Total Productive Maintenance Review and Overall Equipment Effectiveness Measurement
Author/Authors :
Almeanazel, Osama Taisir R. Hashemite University - Department Of Industrial Engineering, Jordan
From page :
517
To page :
522
Abstract :
This paper will review the goals and benefits of implementing Total Productive Maintenance, and it will also focusing on calculating the overall equipment effectiveness in one of Steel Company in Jordan, and it also discuss what called the big six losses in any industry (the quality, availability and speed). A case study taken from Steel Company in Jordan, the data taken along fifteen working days and teams formed in period of two months to find out the benefit of formation a multidiscipline team from different department to eliminate any boundaries between the departments and make the maintenance process more effectively, labors on the production line also included in way to adopt the autonomous maintenance operations (daily maintenance). As a result the company achieved 99% in quality factor of overall equipment effectiveness equation and 76% in availability where in performance it got 72%. Set of techniques like Single minute exchange die, computer maintenance management system, and production planning were suggested to the industry after calculating the OEE to improve their maintenance procedures and improve the productivity
Keywords :
TPM , Total Productive Maintenance , Overall Equipment Effectiveness
Journal title :
Jordan Journal of Mechanical and Industrial Engineering
Journal title :
Jordan Journal of Mechanical and Industrial Engineering
Record number :
2643977
Link To Document :
بازگشت