Title of article :
Costing of the Production and Delivery of Ready-Mix-Concrete
Author/Authors :
Al-Araidah, O. Jordan University of Science and Technology - Industrial Engineering Department, Jordan , Momani, A. Jordan University of Science and Technology - Industrial Engineering Department, Jordan , AlBashabsheh, N. Jordan University of Science and Technology - Industrial Engineering Department, Jordan , Mandahawi, N. Hashemite University - Department of Industrial Engineering, Jordan , Fouad, R. H. Hashemite University - Department of Industrial Engineering, Jordan
Abstract :
The paper presents a model for costing production and transportation of ready-mix-concrete (RMC) based on type of the mix and customer site information. The on-floor cost of the mix is based on the type of concrete and is estimated using activity based costing (ABC). The cost of transporting RMC to customer s site is obtained as a function of traveling distance, traffic factor, and demand. Volume-based discounts, penalty for late delivery, and cost of mix spoilage are considered. Moreover, the paper provides a cost ground for improving the RMC production system using activity based management (ABM) to improve the financial performance of the company. The proposed model is applied at a local RMC company where obtained results show differences between the costing system of the company and that using the proposed model.
Keywords :
Activity , based costing (ABC) , Activity , based management (ABM) , Ready mix concrete (RMC)
Journal title :
Jordan Journal of Mechanical and Industrial Engineering
Journal title :
Jordan Journal of Mechanical and Industrial Engineering