• Title of article

    Flow shop scheduling under Time-Of-Use electricity tariffs using fuzzy multi-objective linear programming approach

  • Author/Authors

    Badri, Amin Department of Industrial Engineering - Faculty of Technology and Engineering - East of Guilan - University of Guilan, Rudsar-Vajargah, Iran , Daghbandan, Allahyar Department of Chemical Engineering - Faculty of Engineering - University of Guilan, Rasht, Iran , Aghabeiginiyay Fatalaki, Zahra Department of Industrial Engineering - Kooshyar higher education institute, Rasht, Iran , Mirzazadeh, Mohammad Department of Engineering Sciences, Faculty of Technology and Engineering - East of Guilan - University of Guilan - Rudsar-Vajargah, Iran

  • Pages
    13
  • From page
    215
  • To page
    227
  • Abstract
    Given the reduction of non-renewable energy resources and increase of energy costs during recent years, developing an efficient scheduling model considering energy consumption is necessary in manufacturing systems. This paper is dedicated to flow shop scheduling problem under Time-Of-Use electricity tariffs. In this regard, a bi-objective mixed-integer programming model is formulated for the problem. Two objectives, namely, the minimization of the total electricity cost and the sum of earliness and tardiness of jobs, are considered simultaneously. The bi-objective model is converted into an equivalent single objective linear programming model using fuzzy multi-objective programming approach. The CPLEX solver in GAMS software is used to solve the proposed model for an instance. The numerical example shows that the proposed model is reasonable and applicable.
  • Keywords
    mixed-integer programming , bi-objective model , electricity price , earliness , tardiness
  • Journal title
    Journal of Mathematical Modeling(JMM)
  • Serial Year
    2021
  • Record number

    2688056