Title of article :
Modeling and solving multi‑skilled resource‑constrained project scheduling problem with calendars in fuzzy condition
Author/Authors :
Ahmadpour, Sama School of Industrial Engineering - Islamic Azad University - South Tehran Branch, Tehran, Iran , Ghezavati, Vahidreza School of Industrial Engineering - Islamic Azad University - South Tehran Branch, Tehran, Iran
Abstract :
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of
activities in a given time. Then, considering uncertainty condition for parameters, it provided a fuzzy scheduling model and
validated models by solving different examples. The proposed mathematical programming model optimizes the allocation
of limited resources to project activities for scheduling purposes in an essential activity in the real condition of scheduling
problems. Moreover, the proposed model can decrease the risk of deviation from scheduling by allocating members
with higher skill factors to critical activities. Then, considering uncertainty condition for parameters, it provided a fuzzy
scheduling model and validated models by solving different examples. Considering fuzzy conditions for the calendar of the
project and multi-skill operators are firstly considered in this paper. Also, the recyclable resources are staff resources which
are being considered for the model concurrently in response to the risks of availability to resources and delay in completing
the project under uncertainty. The results derived from the model solved by CPLEX indicated a decreased need for employment
and shortened project completion duration. Assuming the uncertainty of available resource capacity at any time, the
results obtained from the fuzzy model for the value of objective function were evaluated under the influence of the resource
calendar and showed the benefits. Effect of the multi-skill members with calendar constraints on the model is tested, and the advantages are determined.
Keywords :
Efficiency , Fuzzy planning , Multi-skill resources , Project scheduling , Skill factor
Journal title :
Journal of Industrial Engineering International