Title of article
Prediction of Roof Failure in Pre-driven Entries and Selecting a Suitable Type of Recovery Room Method in Longwall Mining
Author/Authors
Aghababaei ، Sajjad Department of Mining Engineering - Shahid Bahonar University of Kerman , Jalalifar ، Hossein Department of Mining Engineering - Shahid Bahonar University of Kerman , Hosseini ، Ali Department of Mining and Metallurgical Eng. - Yazd University , Chinaei ، Farhad Department of Mining Engineering - Islamic Azad University, Meymeh Branch , Najafi ، Mehdi Department of Mining and Metallurgical Eng. - Yazd University
From page
223
To page
237
Abstract
In this work, two rock engineering system (RES)-based models are presented, the first model to predict the roof failure when a longwall face advances toward a pre-driven recovery room (PDRR) and the second model to select the type of recovery room method for longwall mining. For the first model, an international database of 43 case histories from the pre-driven rooms including technical parameters and type of corresponding operation outcome of each case history is considered. In this regard, a vulnerability index (VI) that refers to the risk of roof failure is calculated for each case history and the VIs are compared with the type of the corresponding outcomes. The obtained results indicate that the calculated VIs have a good adaptation with the corresponding outcomes. This approach could be used to analyze the risk of failure in PDRR, and determine the critical VI that specifies the boundary between the hazard range and the safe range that leads to an accurate operational planning. In the following, a method called multi-options RES-based model (MORESM) is adopted for the selection of recovery room methods in longwall operation. By this model, selecting the optimum option from several options in terms of many effective parameters on the system is possible. Based on the evaluations, CRR, PDRR3, and PDRR2 3 are the suitable options for the case study. This model could introduce the suitable option based on geotechnical conditions but the final decision depends on the economic policy of the managing team.
Keywords
Recovery room , Pre , driven entries , Longwall mining , Rock engineering system , Multiple , options RES , based Model (MORESM)
Journal title
Journal of Mining and Environment
Journal title
Journal of Mining and Environment
Record number
2771821
Link To Document