• Title of article

    Reasons for Cost and Schedule Increase for Engineering Design Projects

  • Author/Authors

    Chang، Andrew Shing-Tao نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    -28
  • From page
    29
  • To page
    0
  • Abstract
    Cost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. This paper identifies the reasons bottom up from four case project documents and further quantifies their contributions to cost and schedule increases. These reasons are complete and can be used to analyze the cause-effect relationship, trace responsibility, and improve performance for engineering design projects.
  • Journal title
    JOURNAL OF MANAGEMENT IN ENGINEERING
  • Serial Year
    2002
  • Journal title
    JOURNAL OF MANAGEMENT IN ENGINEERING
  • Record number

    35658