Title of article :
EHV transformer bank unbalance: practical issues and solutions
Author/Authors :
Gutman، نويسنده , , R.، نويسنده , , Wagenaar، نويسنده , , L.B.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1996
Abstract :
An unconventional tap configuration has
been implemented in AEP’s South Canton 7651345134.5 kV,
3-500 MVA transformer bank to counter the combined
effects of impedance mismatch within the bank and natural
unbalance of the extra-high-voltage (EHV) transmission
system. These effects manifest themselves as unequal phase
voltages and loadings and as elevated neutral and tertiary
circulating currents in the bank, capable of reaching high
magnitudes during heavy loading conditions. This paper
describes the South Canton bank unbalance, the concerns it
raised, and the actions taken by AEP to control its possible
adverse effects on the integrity and operation of the South
Canton Station facilities.
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY