Title of article
An improved method for HV substation lightning performance estimation
Author/Authors
Stojkovic، نويسنده , , Z.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1999
Pages
6
From page
917
To page
922
Abstract
The paper presents a statistical approach to the highvoltage
substation lightning performance estimation. The method
involves the monthly distribution of the lightning discharges to the
lines, determined according to the l i e geometry and thunder
activity, as well as the monthly probability distribution of the substation
configurations. The mean time between failure of the power
transformer insulations is estimated for a 400 kV / 110 kV transformer
substation. The paper provides the analysis of the results
obtained for various dispositions, number and place of positioning
the surge arresters, as well as the power transformer basic insulation
level. The improved procedure of the lightning performance
estimation can contribute to a more economical substation design.
Keywords
HV substation , Lightning , Transformer insulation failure
Journal title
IEEE TRANSACTIONS ON POWER DELIVERY
Serial Year
1999
Journal title
IEEE TRANSACTIONS ON POWER DELIVERY
Record number
399847
Link To Document