Field stringing test near a live conductor at the Hokkaido-Honshu HVDC link line
Author/Authors :
Suda، نويسنده , , T.، نويسنده , , Amano، نويسنده , , Y.، نويسنده , , Fujii، نويسنده , , K.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
7
From page :
1062
To page :
1068
Abstract :
A 600kV HVdc transmission line is currently being constructed jointly by some electric power companies in Japan. Following construction of this overhead transmission line, the ability to work near a live line in a safe manner is one of the most important factors for system reliability. We conducted a survey of work near a live line using the t25OkV Hokkaido-Honshu HVdc Link Line in July 1990 before this overhead transmission line was upgraded. As a result, we clarified various problems in the work conducted near a live line and suggested some countermeasures such as the grounding of stringing conductors at more than one point.
Keywords :
Live work , HVdc transmission line , safety , Strixtging
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Serial Year :
1999
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Record number :
399866
Link To Document :
بازگشت