Title of article :
Field stringing test near a live conductor at the Hokkaido-Honshu HVDC link line
Author/Authors :
Suda، نويسنده , , T.، نويسنده , , Amano، نويسنده , , Y.، نويسنده , , Fujii، نويسنده , , K.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Abstract :
A 600kV HVdc transmission line is currently being
constructed jointly by some electric power companies in Japan. Following
construction of this overhead transmission line, the ability to
work near a live line in a safe manner is one of the most important
factors for system reliability. We conducted a survey of work near a
live line using the t25OkV Hokkaido-Honshu HVdc Link Line in July
1990 before this overhead transmission line was upgraded. As a result,
we clarified various problems in the work conducted near a live
line and suggested some countermeasures such as the grounding of
stringing conductors at more than one point.
Keywords :
Live work , HVdc transmission line , safety , Strixtging