Title of article :
Safety considerations when placing a person with tools in an air gap to change porcelain and glass insulators on transmission systems of 345 kV and above, using ladder and aerial lift methods
Issue Information :
روزنامه با شماره پیاپی سال 2002
Pages :
4
From page :
805
To page :
808
Abstract :
This paper provides general considerations for determining working clearances required to carry out live line barehand insulator change out work on energized power lines operating at 345 kV and above. It is intended to focus on a limited number of procedures and will only address one common structure configuration. This paper is intended to be used in conjunction with IEEE 516 Guide for Maintenance Methods on Energized Power Lines.
Keywords :
bare hand work , glassinsulators , air gap , Aerial lift methods , live line work , porcelain insulators.
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Serial Year :
2002
Journal title :
IEEE TRANSACTIONS ON POWER DELIVERY
Record number :
400408
Link To Document :
بازگشت