• Title of article

    Evaluation of construction methods and performance for high rise public housing construction in Hong Kong

  • Author/Authors

    C. M. Tam، نويسنده , , Z. M. Deng، نويسنده , , S. X. Zeng، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    9
  • From page
    983
  • To page
    991
  • Abstract
    Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong Kong. Three different construction schemes with the same standard “Harmony” design were investigated. These schemes differ in the floor slab construction methods and the material handling plant input. Cycle duration, labour resource usage and costs in three schemes are analysed and examined. The findings have revealed that Scheme 2 with a six-day floor cycle duration is the most economical option on the basis of manpower and cost. However, Scheme 3 with four-day floor cycle duration is the preferred option because the speed of construction is of paramount importance in Hong Kong.
  • Keywords
    Public housing construction , Hong Kong , Construction methods , Production performance , Time and cost
  • Journal title
    Building and Environment
  • Serial Year
    2002
  • Journal title
    Building and Environment
  • Record number

    408528