Risk analysis in fixed-price design–build construction projects
Author/Authors
Ahmet Ozta ، نويسنده , , Onder Okmen، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2004
Pages
9
From page
229
To page
237
Abstract
Construction projects are being tendered and implemented under different contract systems and payment methods. Design–build has been a popular contract system in recent years. It provides various advantages through entailing the contractor carrying out and being responsible for not only construction but also the design of the work. However, design–build turns out to be a risky system for both owners and contractors unless the risks are identified, analyzed and managed throughout the tender preparation and project execution stages. In this context, this study aims to present a literature survey on the issues of risk, risk management/analysis and the design–build contract system, to propose a schedule and cost risk analysis model, and to show the applicability of these models in scheduling and cost estimation of a fixed-price design–build construction project through a case study.
Keywords
construction , Contract system , Design–build , Monte Carlo simulation , Riskanalysis
Journal title
Building and Environment
Serial Year
2004
Journal title
Building and Environment
Record number
408738
Link To Document