• Title of article

    Start-up alternatives and performance of an UASB pilot plant treating diluted municipal wastewater at low temperature

  • Author/Authors

    J.A. alvarez، نويسنده , , I. Ruiz، نويسنده , , M. Gomez، نويسنده , , J. Presas، نويسنده , , M. Soto، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2006
  • Pages
    10
  • From page
    1640
  • To page
    1649
  • Abstract
    Different start-up procedures of an upflow anaerobic sludge bed (UASB) digester were carried out. Start-up without inoculum (experiment A) was delayed for about 120 day. The digester reached 75–85% total suspended solids (TSS) removal, 54–58% total chemical oxygen demand (TCOD) removal and 63–73% biological oxygen demand (BOD5) removal at influent concentrations of 240–340 mg TCODi l−1, temperatures of 13.5–15 °C and hydraulic retention times (HRT) of 10–11 h. Digested sludge was used as inoculum in experiment B. After the start-up period of 75 days, digester efficiencies were 58%, 41% and 54% for TSS, TCOD and BOD5 removal, respectively, working at 169 mg TCODi l−1, temperature of 14 °C and HRT of 11 h. The sludge bed developed and stabilised quickly when using a hydraulically adapted inoculum (experiment C), but TCOD and BOD5 removals remained low and volatile fatty acids (VFA) accumulated in the effluent.
  • Keywords
    Anaerobic digestion , UASB , Start-up , Diluted municipal wastewater , low temperature
  • Journal title
    Bioresource Technology
  • Serial Year
    2006
  • Journal title
    Bioresource Technology
  • Record number

    412230