Title of article :
Optimal step-by-step restoration of distribution systems during excessive loads due to cold load pickup
Author/Authors :
Canbolat Uçak، نويسنده , , Anil Pahwa، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1995
Pages :
8
From page :
121
To page :
128
Abstract :
Restoration of a distribution system following extended outages may cause problems if the substation transformer capacity cannot supply the initial load. Excessive initial load is a result of loss of diversity in the distribution system. Dividing the system into sections and restoring these sections step by step is one of the solutions to overcome excessive load due to cold load pickup. In step-by-step restoration, the order of restoration of sections becomes an important factor in increasing the reliability and decreasing the average customer interruption duration. In this paper, step-by-step restoration of a distribution system to utilize transformer capacity to the maximum extent and to minimize the customer interruption duration is studied.
Keywords :
Distribution network restoration , cold load pickup , Reliability evaluation , Customer interruptions
Journal title :
Electric Power Systems Research
Serial Year :
1995
Journal title :
Electric Power Systems Research
Record number :
415175
Link To Document :
بازگشت