Title of article
Timings of high voltage circuit-breaker
Author/Authors
Bartosz Rusek، نويسنده , , Gerd Balzer، نويسنده , , Martin Holstein، نويسنده , , Max-Steffen Claessens، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2008
Pages
6
From page
2011
To page
2016
Abstract
The reliability of an electrical power system is influenced by the operation of circuit-breaker (CB). A good indicator of circuit-breaker condition is its switching time. Based on it some of the critical circuit-breaker irregularities can be detected and removed before they develop to a failure. In this paper, the evaluation of time measurements (timings) in case of different failures will be carried out for two circuit-breaker solutions, i.e. with spring and hydraulic drive. Moreover, the relationships between switching time and failure type/location will be derived. Thereby, the influence of failure trend will also be taken into account.
Keywords
Circuit-Breaker , Maintenance , Timing , Condition assessment , Reliability
Journal title
Electric Power Systems Research
Serial Year
2008
Journal title
Electric Power Systems Research
Record number
415447
Link To Document