Title of article :
Pricing residential load shedding as a call option
Author/Authors :
Charles G. Geiss، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1998
Pages :
8
From page :
309
To page :
316
Abstract :
Air-conditioner power-interruption programs are shown by simulation to reduce the peaks of a utility load profile. The value of this load-shifting capability is determined by a financial call option pricing model. The air-conditioner interruption option is determined to be worth about $0.65 per summer month to a representative utility; but this value varies widely with costs, volatility of demand, and the skill of implementation by utility managers. The interruption option is given an imputed value derived from the share prices of the utility. This imputed value approximates the value obtained by simulation.
Journal title :
Energy
Serial Year :
1998
Journal title :
Energy
Record number :
415861
Link To Document :
بازگشت