• Title of article

    Data center power requirements: measurements from Silicon Valley

  • Author/Authors

    J. Mitchell-Jackson، نويسنده , , J. G. Koomey، نويسنده , , B. Nordman، نويسنده , , M. Blazek، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2003
  • Pages
    14
  • From page
    837
  • To page
    850
  • Abstract
    Current estimates of data center power requirements are greatly overstated because they are based on criteria that incorporate oversized, redundant systems, and several safety factors. Furthermore, most estimates assume that data centers are filled to capacity. For the most part, these numbers are unsubstantiated. Although there are many estimates of the amount of electricity consumed by data centers, until this study, there were no publicly available measurements of power use. This paper examines some of the reasons why power requirements at data centers are overstated and adds actual measurements and the analysis of real-world data to the public policy debate over how much energy these facilities use.
  • Journal title
    Energy
  • Serial Year
    2003
  • Journal title
    Energy
  • Record number

    416309