Title of article :
Seven basic rules for the PBR regulator
Author/Authors :
Peter Navarro، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1996
Pages :
7
From page :
24
To page :
30
Abstract :
The California PBR experience in the case of San Diego Gas & Electric Co. should serve as a model for every other regulatory commission in the nation on how not to use PBR. This case shows that a poorly designed and administered PBR may defeat the goal of improving economic competitiveness and, through its failure, slow the pace of needed reform.
Journal title :
The Electricity Journal
Serial Year :
1996
Journal title :
The Electricity Journal
Record number :
432077
Link To Document :
بازگشت