• Title of article

    On-Site Generation and Pricing Policies for a Local Distribution Company: A Utility Line Is “Used and Useful” Even if It’s Not in Use

  • Author/Authors

    Sheldon Switzer، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2004
  • Pages
    9
  • From page
    30
  • To page
    38
  • Abstract
    A distribution demand ratchet could provide an alternative to standby charges for distribution, so that wires costs are recovered based on the maximum demand recorded for a customer over the past year. This proposal would eliminate kWh charges for the collection of wires costs and rely on demand as a good proxy for the facilities required for the reliable delivery of energy to the customer.
  • Journal title
    The Electricity Journal
  • Serial Year
    2004
  • Journal title
    The Electricity Journal
  • Record number

    432997