Title of article :
Test requirements for 42 V battery systems
Author/Authors :
M.J. Weighall، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2003
Pages :
9
From page :
151
To page :
159
Abstract :
The introduction of the 42 V PowerNet imposes new performance requirements on the battery. The required performance parameters will vary dependent on the application and to what extent the power train is hybridised, with additional features such as start–stop, launch assist etc. This makes it more difficult to specify relevant laboratory test procedures. This paper reviews the vehicle electrical system developments and the impact these developments will have on the battery performance and testing requirements. Suitable test equipment from Digatron/Firing Circuits is discussed and reviewed.
Keywords :
Battery test equipmentArticle Outli , 42 V PowerNet , Battery testing
Journal title :
Journal of Power Sources
Serial Year :
2003
Journal title :
Journal of Power Sources
Record number :
444246
Link To Document :
بازگشت