Title of article :
Renovation of epithermal neutron beam for BNCT at THOR
Author/Authors :
Y. -W. H. Liu، نويسنده , , T. T. Huang، نويسنده , , S. H. Jiang، نويسنده , , H. M. LIU، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Pages :
5
From page :
1039
To page :
1043
Abstract :
Heading for possible use for clinical trial, THOR (Tsing Hua Open-pool Reactor) at Taiwan was shutdown for renovation of a new epithermal neutron beam in January 2003. In November 2003, concrete cutting was finished for closer distance from core and larger treatment room. This article presents the design base that the construction of the new beam is based on. The filter/moderator design along the beam is Cd(0.1 cm)+Al(10 cm)+FLUENTAL™(16 cm)+Al(10 cm)+FLUENTAL(24 cm)+Void(18 cm)+Cd(0.1 cm)+Bi(10 cm) with 6 cm Pb as reflector. Following the filter/moderator is an 88 cm long, 6 cm thick Bi-lined collimator with Li2CO3-PE at the end. The collimator is surrounded by Li2CO3-PE and Pb. The calculated beam parameters under 2 MW at the beam exit is φepi=3.4×109 n/cm2/s, Df/φepi=2.8×10−11 cGy cm2/n, Dγ/φepi=1.3×10−11 cGy cm2/n, and J+/φ= 0.8. For a phantom placed 10 cm from beam exit, MCNP calculation shows that the advantage depth is 8.9 cm, and advantage ratio is 5.6 if boron concentration in tumor and normal tissue are assumed to be 65 and 18 ppm. The maximum dose rate for normal tissue is 50 cGy/min. The maximum therapeutic ratio is 6. The construction of the beam is scheduled to be finished by the end of April 2004.
Keywords :
THOR , Renovation , Epithermal neutron beam design
Journal title :
Applied Radiation and Isotopes
Serial Year :
2004
Journal title :
Applied Radiation and Isotopes
Record number :
541870