Title of article
Solving a bi-objective project capital budgeting problem using a fuzzy multi-dimensional knapsack
Author/Authors
Khalili-Damghani ، K. نويسنده Assistant Prof., Dep. of Industrial Engineering Khalili-Damghani , K. , Taghavifard ، M. نويسنده Assistant Prof. Dep. of Industrial Engineering Taghavifard , M.
Issue Information
فصلنامه با شماره پیاپی 13 سال 2011
Pages
7
From page
67
To page
73
Abstract
In this paper, the researchers have proposed a multi-dimensional knapsack model for project capital budgeting problem in uncertain situation which has been modeled through fuzzy sets. The optimistic and pessimistic situations were considered and associated deterministic models were yielded. Numerical example has been supplied toillustrate the performance of proposed model. The results were promising in the sense of helping the decision makers.
Journal title
Journal of Industrial Engineering International
Serial Year
2011
Journal title
Journal of Industrial Engineering International
Record number
655916
Link To Document