• Title of article

    Flexible flowshop scheduling with equal number of unrelated parallel machines

  • Author/Authors

    Mahdavi، I. نويسنده , , Zarezadeh ، V. نويسنده M.Sc., Dep. of Industrial Engineering Zarezadeh , V. , Shahnazari-Shahrezaei ، P. نويسنده Ph.D. Student, Dep. of Industrial Engineering Shahnazari-Shahrezaei , P.

  • Issue Information
    فصلنامه با شماره پیاپی 13 سال 2011
  • Pages
    10
  • From page
    74
  • To page
    83
  • Abstract
    This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly generated and results obtained by proposed heuristic are compared with optimal solutions reported by the Lingo 8.0 package applying the branch & bound approach. The results show that the proposed hybrid method is more efficient when the problem sizes have been increased.
  • Journal title
    Journal of Industrial Engineering International
  • Serial Year
    2011
  • Journal title
    Journal of Industrial Engineering International
  • Record number

    655917