Title of article
Flexible flowshop scheduling with equal number of unrelated parallel machines
Author/Authors
Mahdavi، I. نويسنده , , Zarezadeh ، V. نويسنده M.Sc., Dep. of Industrial Engineering Zarezadeh , V. , Shahnazari-Shahrezaei ، P. نويسنده Ph.D. Student, Dep. of Industrial Engineering Shahnazari-Shahrezaei , P.
Issue Information
فصلنامه با شماره پیاپی 13 سال 2011
Pages
10
From page
74
To page
83
Abstract
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly generated and results obtained by proposed heuristic are compared with optimal solutions reported by the Lingo 8.0 package applying the branch & bound approach. The results show that the proposed hybrid method is more efficient when the problem sizes have been increased.
Journal title
Journal of Industrial Engineering International
Serial Year
2011
Journal title
Journal of Industrial Engineering International
Record number
655917
Link To Document