Title of article :
Two-machine robotic cell considering different loading and unloading times
Author/Authors :
Kimiagari، Ali Mohammad نويسنده Associate Professor, Dept. of Industrial Engineering , , Mosadegh، Hadi نويسنده M.Sc. Student, Dept. of Industrial Engineering ,
Issue Information :
فصلنامه با شماره پیاپی 14 سال 2011
Abstract :
In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a good solution rapidly. A domination rule has been developed and used in SA algorithm that strongly reduces the search space and increases speed and solutionʹs quality of the algorithm. Numerical experiments indicate the results of the proposed SA from two points of view: quality of solution and consumed time.
Journal title :
Journal of Industrial Engineering International
Journal title :
Journal of Industrial Engineering International