Title of article
A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Author/Authors
موسوي، سيدميثم نويسنده PHD Student, Young Researches Club, South Tehran Branch, Islamic Azad University, Tehran, Iran Mousavi , Seyed Meysam , رييسي، صديق نويسنده دانشگاه آزاد اسلامي واحد تهران جنوب Raiesi, S , وحداني، بهنام نويسنده Department of Industrial and Mechanical Engineering, Qazvin Azad University, Qazvin, Iran vahdani, behnam
Issue Information
فصلنامه با شماره پیاپی 7 سال 2011
Pages
14
From page
57
To page
70
Abstract
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response planning. This paper presents a new decision-making methodology in a fuzzy environment to evaluate and select the appropriate responses for project risks. To this end, two fuzzy well-known decision-making techniques, namely, decision tree and TOPSIS (technique for order preference by similarity to ideal solution), are extended based on multiple selected criteria, simplifying parameterized metric distance and fuzzy similarity measure. Finally, a case study in an oil and gas project in Iran is provided to show the suitability of the proposed fuzzy methodology in large-scale practical situations.
Journal title
Journal of Optimization in Industrial Engineering
Serial Year
2011
Journal title
Journal of Optimization in Industrial Engineering
Record number
680926
Link To Document