    Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

  • Author/Authors

    Gupta، D نويسنده Prof. & Head. Department of Mathematics , , Sharma، S نويسنده Assistant Prof., Department of Mathematics , , Bala، S نويسنده Research Scholar, Department of Mathematics ,

  • Issue Information
    فصلنامه با شماره پیاپی 6 سال 2012
  • Pages
    13
  • From page
    31
  • To page
    43
  • Abstract
    One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs are not completely random, but bear a well defined relationship to one another to minimize the utilization time of machines and hence their rental cost under a specified rental policy. Further the processing times and independent set up times, each are associated with probabilities. A computer programme followed by a numerical illustration is given to validate the proposed algorithm.
  • Journal title
    International Journal of Applied Operational Research
  • Serial Year
    2012
  • Journal title
    International Journal of Applied Operational Research
  • Record number

    688679