Title of article :
Average outgoing quality of CSP-C continuous sampling plan under short run production processes
Author/Authors :
S. Balamurali & Chi-Hyuck Jun، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2006
Abstract :
A CSP-C continuous sampling plan is a new single-level continuous sampling
procedure developed by Govindaraju & Kandasamy (2000) by incorporating the concept of
acceptance number to the CSP-1 plan for the application of continuous production processes. In
this new plan, the sampling inspection phase is characterized by a maximum allowable number of
non-conforming units, c, and a constant sampling rate, f. Govindaraju & Kandasamy (2000)
derived the performance measures such as average outgoing quality (AOQ), average fraction
inspected (AFI) etc, of the CSP-C plan using a Markov chain model for long run production
processes. Yang (1983) has observed that the AOQ and AFI, being long run average measures,
are not satisfactory measures of performance for short run production processes. Hence,
formulas are derived in this paper, using the renewal theory approach enabling one to compute
AOQ and AFI for both long run and short run production processes. Numerical illustrations are
also given. By simulation, the accuracy of the short run measures is studied.
Keywords :
Average outgoing quality , renewal theory , short run production process
Journal title :
JOURNAL OF APPLIED STATISTICS
Journal title :
JOURNAL OF APPLIED STATISTICS