Title of article
Integrated production planning and scheduling on automobile assembly lines
Author/Authors
Yan، Hong-Sen نويسنده , , Xia، Qi-Feng نويسنده , , Zhu، Min-Ru نويسنده , , Liu، Xia-Ling نويسنده , , Guo، Zhi-Min نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2003
Pages
-710
From page
711
To page
0
Abstract
Addresses the closely related problems in production planning and scheduling on mixed model automobile assembly lines. Proposition of integrated solution that is feasible to aggregate capacity constraints; Development of three tabu-search-based algorithms; Implementation of stochastic extensions.
Keywords
Canonical form and rising ridges , Method of ridge identification , Use of the linear regression models , Analysis of fitting ridge models with linear and nonlinear regression , classification and confirmation
Journal title
IIE TRANSACTIONS
Serial Year
2003
Journal title
IIE TRANSACTIONS
Record number
7887
Link To Document