Title of article
Scheduling the fabrication and assembly of components in a two-machine flowshop
Author/Authors
CHENG، T.C. EDWIN نويسنده , , WANG، GUOQING نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1999
Pages
-134
From page
135
To page
0
Abstract
In this paper we study the problem of scheduling the fabrication and assembly of components in a two-machine flowshop so as to minimize the makespan. Each job consists of a component unique to that job and a component common to all jobs. Both the unique and the common components are processed on the first machine. While the unique components are processed individually, the common components are processed in batches and a setup is needed to form each batch. The assembly operations of a job is performed on the second machine, and can only begin when both components for the job are available. We first show that the problem is NP-complete with either batch availability or item availability for the common components. We identify several properties of an optimal solution to the problem, and some polynomially solvable special cases.
Keywords
PALLADIUM , Aliquat 336 , Extraction kinetics , LIX 63
Journal title
IIE TRANSACTIONS
Serial Year
1999
Journal title
IIE TRANSACTIONS
Record number
8007
Link To Document