• Title of article

    Scheduling the fabrication and assembly of components in a two-machine flowshop

  • Author/Authors

    CHENG، T.C. EDWIN نويسنده , , WANG، GUOQING نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    -134
  • From page
    135
  • To page
    0
  • Abstract
    In this paper we study the problem of scheduling the fabrication and assembly of components in a two-machine flowshop so as to minimize the makespan. Each job consists of a component unique to that job and a component common to all jobs. Both the unique and the common components are processed on the first machine. While the unique components are processed individually, the common components are processed in batches and a setup is needed to form each batch. The assembly operations of a job is performed on the second machine, and can only begin when both components for the job are available. We first show that the problem is NP-complete with either batch availability or item availability for the common components. We identify several properties of an optimal solution to the problem, and some polynomially solvable special cases.
  • Keywords
    PALLADIUM , Aliquat 336 , Extraction kinetics , LIX 63
  • Journal title
    IIE TRANSACTIONS
  • Serial Year
    1999
  • Journal title
    IIE TRANSACTIONS
  • Record number

    8007