Title of article :
The capacitated lot sizing problem with setup carry-over
Author/Authors :
SOX، CHARLES R. نويسنده , , GAO، YUBO نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
-172
From page :
173
To page :
0
Abstract :
Although there is a significant amount of literature on the capacitated lot sizing problem, there has been insufficient consideration of planning problems in which it is possible for a lot size, or production run, to continue over consecutive time periods without incurring multiple setups. While there are papers that consider this feature, they typically restrict production to at most one product in each period. We present a set of mixed integer linear programs for the capacitated lot sizing problem that incorporate setup carry-over without restricting the number of products produced in each time period. Efficient reformulations are developed for finding optimal solutions, and a Lagrangian decomposition heuristic is provided that quickly generates near-optimal solutions. The computational results demonstrate that incorporating setup carry-over has a significant effect on both cost and lot sizes.
Keywords :
Aliquat 336 , LIX 63 , Extraction kinetics , PALLADIUM
Journal title :
IIE TRANSACTIONS
Serial Year :
1999
Journal title :
IIE TRANSACTIONS
Record number :
8014
Link To Document :
بازگشت