• Title of article

    Scheduling one and two-processor tasks on two parallel processors

  • Author/Authors

    Cai، Xiaoqiang نويسنده , , Lee، Chung-Yee نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    -444
  • From page
    445
  • To page
    0
  • Abstract
    In this paper we study a two-processor scheduling problem where some tasks need to be processed by one processor, while the others have to be processed by both processors simultaneously. The objective is to minimize the total weighted completion time. We first examine the complexity of the problem, showing that it is NP-complete in the strong sense. We then derive optimality properties, and present dynamic programming algorithms, which can find optimal solutions in pseudo-polynomial time. Heuristic methods that can find approximate solutions efficiently are also proposed, and the error bounds of the approximate solutions are established. Finally, a special case is examined and a polynomial algorithm is provided. We show in the Appendix that the problem of minimizing the maximum lateness is also strongly NP-complete and that most of our approaches can be modified to solve this problem.
  • Keywords
    PALLADIUM , LIX 63 , Extraction kinetics , Aliquat 336
  • Journal title
    IIE TRANSACTIONS
  • Serial Year
    1999
  • Journal title
    IIE TRANSACTIONS
  • Record number

    8059