• Title of article

    An ABC analysis for power generation project

  • Author/Authors

    Hasani ، Batool نويسنده , , Vakilalroaia ، Younos نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی 19 سال 2013
  • Pages
    6
  • From page
    1943
  • To page
    1948
  • Abstract
    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.
  • Journal title
    Management Science Letters
  • Serial Year
    2013
  • Journal title
    Management Science Letters
  • Record number

    841872