Title of article :
Timing control points via simulation for production systems under random disturbances Original Research Article
Author/Authors :
Dimitri Golenko-Ginzburg، نويسنده , , Zohar Laslo، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
8
From page :
451
To page :
458
Abstract :
The paper deals with the problem of production control with disturbances. The problem is applied to semi-automated production systems where the advancement of the process cannot be measured continuously but only in preset control (inspection) points. It is assumed that the production process can be simulated within a time interval of arbitrary size. Given the target amount needed, the due date, the routine control point, the actual accumulated production observed at that point, and the preset confidence probability (chance constraint) of meeting the deadline on time, the decision-maker has to determine the next control point. On-line control has to be carried out as rarely as possible but without missing the moment when the tendency to deviate from the planned trajectory may endanger meeting the due date on time under a chance constraint. Determining the next control point is carried out via simulation with a constant time step. At each intermediate check-point, decision-making based on sequential statistical analysis has to be undertaken, either.
Keywords :
Chance constraint , On-line control , Control point , Sequential statistical analysis , Semi-automated production system
Journal title :
Mathematics and Computers in Simulation
Serial Year :
2001
Journal title :
Mathematics and Computers in Simulation
Record number :
853705
Link To Document :
بازگشت