Harmonization simulation model for managing several stochastic projects
Author/Authors
Ehud Menipaz، نويسنده , , Avner Ben-Yair، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2002
Pages
6
From page
61
To page
66
Abstract
A highly complicated project management system including several simultaneously realized PERT-COST type network projects, is considered. The projects are of different importance and significance; for each project its corresponding priority index is pre-given. The total budget at the project management disposal to carry out all the projects, is limited. Given for each project its priority value, the problem is to determine optimal budget assignments and optimal due dates of accomplishing each project, to maximize the weighted sum of the projects’ utilities. The problem centers on maximizing the system’s utility by implementing the harmonization model for each single project, which has been outlined in our previous publication [Math. Comput. Simul. (2002)]. Thus, the paper under consideration is an essential extension of that publication.
Keywords
System’s utility , Harmonization model , Partial harmonization model , Linear programming algorithm , Budget reassignment among several projects
Journal title
Mathematics and Computers in Simulation
Serial Year
2002
Journal title
Mathematics and Computers in Simulation
Record number
853945
Link To Document