• Title of article

    An approximation algorithm for scheduling dependent tasks on m processors with small communication delays Original Research Article

  • Author/Authors

    C Hanen، نويسنده , , A Munier، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    19
  • From page
    239
  • To page
    257
  • Abstract
    This paper defines and studies an approximation algorithm for scheduling tasks with small communication delays on m processors starting from a schedule σ∞ for the problem instance with an unlimited number of processors with relative performance bounded by α. This solution is used to solve the resource conflicts during the scheduling phase on m processors. A mechanism for UET–UCT tasks systems is first presented and analyzed. Then a rather unusual feature is introduced to handle SCT task systems: a processor may remain idle even if some tasks are feasible in order to wait for a more important task. The schedule generated by this algorithm is proved to have an overall worst-case performance 1+(1−1/m)α. If the best-known ratio α=43 is used it induces a worst-case performance bounded by 73−4/m for our algorithm.
  • Keywords
    Scheduling , Makespan , Communication delays
  • Journal title
    Discrete Applied Mathematics
  • Serial Year
    2001
  • Journal title
    Discrete Applied Mathematics
  • Record number

    885165