Title of article
Efficient generation of rotating workforce schedules Original Research Article
Author/Authors
Nysret Musliu، نويسنده , , Johannes G?rtner، نويسنده , , Wolfgang Slany، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2002
Pages
14
From page
85
To page
98
Abstract
Generating high-quality schedules for a rotating workforce is a critical task in all situations where a certain staffing level must be guaranteed, such as in industrial plants or police departments. Results from ergonomics (BEST, Guidelines for shiftworkers, Bulletin of European Time Studies No. 3, European Foundation for the Improvement of Living and Working Conditions, 1991) indicate that rotating workforce schedules have a profound impact on the health and satisfaction of employees as well as on their performance at work. Moreover, rotating workforce schedules must satisfy legal requirements and should also meet the objectives of the employing organization. In this paper, our description of a solution to this problem is being stated. One of the basic design decisions was to aim at high-quality schedules for realistically sized problems obtained rather quickly, while maintaining human control. The interaction between the decision-maker and the algorithm therefore consists of four steps: (1) choosing a set of lengths of work blocks (a work block is a sequence of consecutive days of work), (2) choosing a particular sequence of blocks of work and days-off blocks amongst these that have optimal weekend characteristics, (3) enumerating possible shift sequences for the chosen work blocks subject to shift change constraints and bounds on sequences of shifts, and (4) assignment of shift sequences to work blocks while fulfilling the staffing requirements. The combination of constraint satisfaction and problem-oriented intelligent backtracking algorithms in each of the four steps allows for finding good solutions for real-world problems in acceptable time. Computational results from a benchmark example found in the literature confirmed the viability of our approach. The algorithms have been implemented in commercial shift scheduling software.
Keywords
Workforce scheduling , backtracking , Search , Constraint satisfaction
Journal title
Discrete Applied Mathematics
Serial Year
2002
Journal title
Discrete Applied Mathematics
Record number
885373
Link To Document